My note to the LBJ construction HQ folks

Description of your first forum.
User avatar
LibraryLady
Posts: 2255
Joined: Mon May 26, 2014 9:08 am

My note to the LBJ construction HQ folks

Postby LibraryLady » Thu Sep 25, 2014 9:39 am

Do you have plans to improve the west bound service road between Marsh Lane and Webb Chapel Road?

At this time, the storm water drains are not level with the pavement. When a vehicle travels the street, there is a bump over each storm drain. Some of the bumps are pretty significant......currently one has a sign warning that there is a bump. IMO, it is pretty bad quality of work to have such significant misalignment of the drains and the street level.

Thank you.

I'll let you know if they respond.
Image

Native Texan

Maya Angelou said:
“I’ve learned that no matter what happens, or how bad it seems today, life does go on, and it will be better tomorrow.

truep
Posts: 486
Joined: Thu May 29, 2014 10:17 am
Location: Flower Mound, TX

Re: My note to the LBJ construction HQ folks

Postby truep » Thu Sep 25, 2014 12:05 pm

I doubt you will ever hear from them.

User avatar
LibraryLady
Posts: 2255
Joined: Mon May 26, 2014 9:08 am

Re: My note to the LBJ construction HQ folks

Postby LibraryLady » Thu Sep 25, 2014 3:54 pm

Received my reply this PM:

Thank you for contacting us.

Currently, the frontage roads where we have not reached final completion (between Josey Lane all the way to Preston Rd.) are approximately 1.25 inches below grade. That is because we are still in the construction phase in sections, and asphalt along these frontage roads have been laid up to the binder course, which is not the last layer, and explains why some of the drainage inlets are slightly higher.

The last layer of asphalt (called SMA) is usually paved in long runs usually done after any digging, or surface modification is needed in the section. Paving the SMA this way will provide a much better quality end product with less joints and better durability. An example of frontage road with the last layer of asphalt placed is just east of Preston, which was part of our Phase 1 opening.

The westbound frontage road between Marsh Lane and Webb Chapel road will receive its final layer of asphalt next year, before full project completion in late 2015.
Image

Native Texan

Maya Angelou said:
“I’ve learned that no matter what happens, or how bad it seems today, life does go on, and it will be better tomorrow.


Return to “Your first forum”

Who is online

Users browsing this forum: Bing [Bot] and 24 guests